Thursday, July 8, 2010

Current projects
















I have some pictures today of the latest work Doug and i doing. The first one is of the side of the cabin where the living room addition is going. A few of the footings are poured and we're continuing to pour the remaining ones. The next pics are of the living room floor. Doug had started to lay a tongue and groove floor over the original log floor before i came out this spring. Since then we have finished laying the rest of the floor and now i'm sanding, cleaning and prepping it for stain and urethane. And the last pics are of the beginning of the bathroom. Once we got some cut from the mill Doug jumped right into framing it up. I also have installed a vinyl floor in the kitchen. I don't have a pic of that because all of the stuff from the living room is in the kitchen right now. As well as those jobs i've been spending a lot of time at the mill cutting lumber.

No comments:

Post a Comment