The photos I have today are of the finished entry to the atrium. While I was in Minnesota Doug was able to put all the siding on the walls that cover the openings under the cabin. When I framed in under the cabin I left a few access holes, one for a dog house, one for storage and one for access under the main entry to the cabin. Those holes allowed Doug to crawl under the cabin and spray foam the back side of the walls and the under side of the floors. With the cooler temperatures we have already been able to feel the difference of the added insulation.
While I was gone Doug also filled the tanks above the kitchen with about 1000 gallons of water. And also finished plumbing all of the water lines to the bathroom and kitchen sink. With the water lines plumbed to the bathroom we now have a flush toilet! For many years the sink in the kitchen has drained into a grey water tank Doug had built into the hillside of the front yard. For the time being the toilet and shower drains are plumed into that grey water system until a separate septic tank is constructed.
No comments:
Post a Comment